PetrFlux
Home / Mining / News
Mining

Vizsla Copper logs high-grade silver at Alaska project

· By PetrFlux Newsroom · Source: MINING.COM
Image: original source (MINING.COM), used for reference with attribution.

The site has benefited from more than $116 million of historical investment and roughly 96,000 metres of drilling.

Vizsla Copper (TSXV: VCU; US-OTC: VCUFF) says new drilling at its Palmer copper-zinc project in southeast Alaska highlights the property’s potential for high-grade silver mineralization.

Standout hole CMR26-215 at the AG deposit cut 21 metres grading 4.79% zinc, 0.14% copper, 116.9 grams silver per tonne and 0.27 gram gold from 180.3 metres depth, Vizsla Copper said Wednesday .

Within that interval, a higher-grade section of 7 metres returned 5.46% zinc, 0.17% copper, 207.5 grams silver and 0.45 gram gold from 182 metres downhole.

Located near the Canadian border, about 60 km from tidewater, Palmer is a volcanogenic massive sulphide project that covers about 330 sq.

The site, which Vizsla Copper acquired in December 2025, has benefited from more than $116 million (C$164 million) of historical investment and roughly 96,000 metres of drilling.

“The AG deposit is an important part of the existing Palmer resource, and these latest results provide additional confidence in the strength and continuity of the mineralization across the central portion of the deposit,” CEO Craig Parry said in a statement.

With all three drill holes from the 2026 infill program at AG now complete, Vizsla Copper plans to use the new results to refine its geological model and to work toward an updated mineral resource estimate for Palmer in next year’s first quarter.

Other results released Wednesday included hole CMR26-211, which cut 37.2 metres grading 3.62% zinc, 0.16% copper, 26.1 grams silver and 0.21 grams gold from 145.1 metres depth.

This included 12.8 metres of 7.79% zinc, 0.31% copper, 31.7 grams silver and 0.19 grams gold from 169.5 metres downhole.

Vizsla Copper (TSXV: VCU; US-OTC: VCUFF) says new drilling at its Palmer copper-zinc project in southeast Alaska highlights the property’s potential for high-grade silver mineralization.

Standout hole CMR26-215 at the AG deposit cut 21 metres grading 4.79% zinc, 0.14% copper, 116.9 grams silver per tonne and 0.27 gram gold from 180.3 metres depth, Vizsla Copper said Wednesday .

Within that interval, a higher-grade section of 7 metres returned 5.46% zinc, 0.17% copper, 207.5 grams silver and 0.45 gram gold from 182 metres downhole.

Located near the Canadian border, about 60 km from tidewater, Palmer is a volcanogenic massive sulphide project that covers about 330 sq.

The site, which Vizsla Copper acquired in December 2025, has benefited from more than $116 million (C$164 million) of historical investment and roughly 96,000 metres of drilling.

Original source: MINING.COM — PetrFlux publishes verified summaries only, and always links back to the original report. See our editorial policy.

Related News

More Mining news →