PetrFlux
Power Generation

Rooppur plant achieves first nuclear chain reaction in Unit 1

· By PetrFlux Newsroom · Source: BN-Nuclear
Image: original source (BN-Nuclear), used for reference with attribution.

The first controlled nuclear chain reaction at Unit 1 of the Rooppur Nuclear Power Plant was achieved at 3:34pm on today (11 October), marking a major milestone in Bangladesh's first nuclear power ...

Unit-1 of the Rooppur Nuclear Power Plant reaches minimum control level, marking the start of a controlled nuclear chain reaction.

Photo: Nikita Greidin/Facebook/Embassy of Russia in Bangladesh The first controlled nuclear chain reaction at Unit 1 of the Rooppur Nuclear Power Plant was achieved today (11 October), marking a major milestone in Bangladesh's first nuclear power project as the reactor entered its initial criticality stage ahead of electricity generation.

The chain reaction marks the first of four stages before the plant can generate electricity.

The subsequent stages involve thermal energy transfer, mechanical energy conversion, and finally electricity generation and supply to the national grid.

Md Anwar Hossain, secretary of the Ministry of Science and Technology, confirmed the development to The Business Standard, saying the reaction was initiated after the required compliance procedures, technical parameters and external certifications had been completed.

"Today at 3:34pm, we were able to achieve the chain reaction smoothly.

By the grace of Allah, the parameters were within the desired ranges, and the reactor was very stable," he said.

Inside a nuclear reactor, a controlled chain reaction splits uranium atoms through nuclear fission, releasing energy as heat.

That heat is used to generate steam, which drives turbines to produce electricity.

Russian specialists, Bangladeshi experts and other technical specialists were present to observe the process and assess the reactor's performance, Anwar added.

He said nuclear fuel had already been loaded into the reactor and the fission process had now begun.

Anwar said technical teams were working to complete the remaining processes as quickly as possible, while stressing that every stage must comply with the required procedures and safety standards.

The Rooppur Nuclear Power Plant in Ishwardi, Pabna, is being built with two VVER-1200 pressurised water reactor units using Russian technology supplied by Rosatom.

Each unit has a planned generation capacity of 1,200 megawatts, giving the plant a combined capacity of 2,400MW.

Original source: BN-Nuclear — PetrFlux publishes verified summaries only, and always links back to the original report. See our editorial policy.

Related News

More Power Generation news →