PetrFlux
Power Generation

Doosan Enerbility, SGRE and Equinor sign MoU for South Korean wind farm

· By PetrFlux Newsroom · Source: BN-Doosan
Image: original source (BN-Doosan), used for reference with attribution.

Doosan Enerbility has signed a memorandum of understanding (MOU) with Siemens Gamesa Renewable Energy (SGRE) and Equinor to collaborate on the 750MW Bandibuli floating offshore wind farm project in ...

Skip to navigation Skip to main content Skip to right column Yahoo Finance Sign in U.S.

markets open in 1h 15m US Markets US Markets Europe Markets Asia Markets Cryptocurrencies Rates Commodities Currencies U.S.

markets open in 1h 15m S&P Futures 7,871.50 +15.75 +0.20% Dow Futures 52,116.00 +181.00 +0.35% Nasdaq Futures 30,780.00 -11.50 -0.04% Russell 2000 Futures 2,807.90 +7.80 +0.28% 10-Yr Bond 5.22 -0.02 -0.44% VIX 15.31 +0.04 +0.26% Gold 4,169.10 -8.20 -0.20% Bitcoin USD 83,729.95 +467.95 +0.56% Crude Oil Nov 26 95.68 +1.54 +1.64% US Private Equity 10,967.34 -1.52 -0.01% ADVERTISEMENT Doosan Enerbility, SGRE and Equinor sign MoU for South Korean wind farm Doosan Enerbility Power Services Business Group CEO Seungwoo Sohn (in the middle) · Power Technology GlobalData October 16, 2024 2 min read GAM.MC ^YH310 Doosan Enerbility has signed a memorandum of understanding (MOU) with Siemens Gamesa Renewable Energy (SGRE) and Equinor to collaborate on the 750MW Bandibuli floating offshore wind farm project in Ulsan, South Korea.

The MOU was signed at the headquarters of Doosan Enerbility in Changwon in the presence of Doosan Enerbility Power Services Business Group CEO Seungwoo Sohn, Siemens Gamesa's offshore business CEO Marc Becker and Equinor Renewables APAC senior vice-president Ingunn Svegården.

The Bandibuli floating offshore wind farm project, spearheaded by Equinor off the coast of Ulsan, will see Siemens Gamesa deploying a 15MW large-size wind turbine.

Doosan Enerbility will contribute to the project by assembling the nacelles, a crucial wind turbine component, at its Changwon wind turbine shop.

Doosan Enerbility founded its offshore wind business in 2005 and offers a diverse product portfolio with models ranging from 3.3MW to 8MW.

The collaboration between Doosan Enerbility and Siemens Gamesa first took shape with an MOU in June 2022.

This was followed by a binding framework agreement for strategic partnership in February 2023, laying the groundwork for the current MOU and future joint ventures in the sector.

Original source: BN-Doosan — PetrFlux publishes verified summaries only, and always links back to the original report. See our editorial policy.

Related News

More Power Generation news →